HOME > News > Company News 
2026.01.12Injection Molding Machine Maintenance Guide
The maintenance of injection molding machines must adhere to a three-tiered system: Daily, Periodic (Weekly/Monthly/Quarterly/Annual), and Specialized Maintenance. The core objectives are to extend equipment lifespan, ensure production precision, and reduce failure rates. The following is a detailed, modular maintenance plan.
I. Daily Maintenance (Required Per Shift/Daily – Simple Operations, Involving All Personnel)
Appearance and Cleaning
Clean plastic debris and dust from the machine body, worktable, and hopper to prevent foreign objects from entering the barrel or guide rails.
Wipe dust from the surface of the electrical control cabinet and check that the cabinet door seals are intact to prevent dust ingress that could cause circuit failures.
Lubrication System Inspection
Check the oil level in the lubricant reservoir, ensuring it is between the upper and lower limit marks. Top up with the same model of lubricating oil if insufficient.
Observe whether the lubricating pump is functioning normally. Check if there is an oil film at all lubrication points (tie-bars, guide rails, screw tail). Investigate pump body or line blockages immediately if no oil is present.
Hydraulic System Inspection
Check the oil level in the hydraulic reservoir. The oil must be clear, free of impurities, and not emulsified. Filter or replace the oil promptly if it appears cloudy.
Inspect hydraulic lines and fittings for leaks. Tighten connections or replace seals immediately upon detecting any leakage.
Safety Device Check
Test emergency stop buttons and safety door limit switches for responsiveness, ensuring the machine stops immediately when triggered.
Inspect protective covers and guards to ensure they are intact, without looseness or deformation.
Post-Production Shutdown
Before shutdown, purge remaining material from the barrel to prevent carbonization. For heat-sensitive materials (e.g., PVC), thoroughly purge the barrel using purging compounds like PE or PP.
Turn off electrical power, air supply, and water supply. Empty the hopper of any moisture-absorbed material.